What would be the total production engineering cost per


Question - At an activity level of 9,300 machine-hours in a month, Falks Corporation's total variable production engineering cost is $829,560 and its total fixed production engineering cost is $192,960. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 9,600 machine-hours in a month? Assume that this level of activity is within the relevant range. (Round intermediate calculations to 2 decimal places.)

Solution Preview :

Prepared by a verified Expert
Accounting Basics: What would be the total production engineering cost per
Reference No:- TGS02754525

Now Priced at $20 (50% Discount)

Recommended (93%)

Rated (4.5/5)