What would be the total production engineering cost per


Question - At an activity level of 4,000 machine-hours in a month, Curt Corporation's total variable production engineering cost is $154,200 and its total fixed production engineering cost is $129,000. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 4,300 machine-hours in a month? Assume that this level of activity is within the relevant range.

A) $68.33

B) $68.55

C) $70.80

D) $65.86

Solution Preview :

Prepared by a verified Expert
Accounting Basics: What would be the total production engineering cost per
Reference No:- TGS02417595

Now Priced at $25 (50% Discount)

Recommended (93%)

Rated (4.5/5)