Question: Your company is considering leasing a building for a new operation. The building will be considered extra hazard group 2. You need to give an estimate to the operations manager on what water supply will be needed at the site. Use the bottom of the curve, highest density number, for the estimate. What water supply duration is required for this situation? 120 minutes 90 minutes 60 minutes 30 minutes