What was the average processing time of the 10 new jobs and


Problem: Consider the subsequent continuously operating job shop. Inter arrival times of jobs are distributed as follows:

Time between Arrivals
(Hours) Probability
0 0.23
1 0.37
2 0.28
3 0.12

08 Processing times for jobs are normally distributed with mean 5Processing times for jobs are normally distributed with mean 50 minutes and standard deviation 8 minutes. Prepare a simulation table, and perform a simulation for 10 new customers. Assume that when the simulation begins there is one job being processed (Scheduled to be completed in 25 minutes) and there is one job with a 50 minute processing time in the queue.

Question 1: What was the average processing time of the 10 new jobs?

Question 2: What was the average time in the queue for the 10 new jobs?

Question 3: What was the maximum time in the system for the 10 new jobs?

Can you provide the answer for the given questions?

Request for Solution File

Ask an Expert for Answer!!
Operating System: What was the average processing time of the 10 new jobs and
Reference No:- TGS0948082

Expected delivery within 24 Hours