What is the upper control limit rounded to two decimal


Given a situation where a control chart with 3-sigma limits is being constructed to monitor the percentage of defective items produced by a process, if samples of 100 units each are taken from the process and the average percent defective found in the first 10 samples is .08 (8%), what is the upper control limit (rounded to two decimal places) for the process??

Request for Solution File

Ask an Expert for Answer!!
Operation Management: What is the upper control limit rounded to two decimal
Reference No:- TGS02465145

Expected delivery within 24 Hours