What is the factory overhead controllable variance


The Joyner Corporation originally budgeted for $360,000 of fixed overhead. Production was budgeted to be 12,000 units. The standard hours for production were 5 hours per unit. The variable overhead rate was $3 per hour. Actual fixed overhead was $360,000 and actual variable overhead was $170,000. Actual production was 11,700 units.

A) What is the factory overhead controllable variance.
B) What is the factory overhead volume variance.

Request for Solution File

Ask an Expert for Answer!!
Accounting Basics: What is the factory overhead controllable variance
Reference No:- TGS0717039

Expected delivery within 24 Hours