What is the average waiting line length in cars what is the


Burrito King (a new fast-food franchise opening up nationwide) has successfully automated burrito production for its drive-up fast-food establishments. The Burro-Master 9000 requires a constant 40 seconds to produce a batch of burritos. It has been estimated that customers will arrive at the drive-up window according to a Poisson distribution at an average of one every 65 seconds. To help determine the amount of space needed for the line at the drive-up window

a. What is the average waiting line length (in cars)? (Do not round intermediate calculations.

b. What is the average number of cars in the system (both in line and at the window)? (Do not round intermediate calculations)

c. What is the expected average time in the system, in minutes? (Do not round intermediate calculations)

Request for Solution File

Ask an Expert for Answer!!
Operation Management: What is the average waiting line length in cars what is the
Reference No:- TGS02441551

Expected delivery within 24 Hours