What is system capacity and which is bottleneck department


Assignment: Operations Management

Part I

How is process selection related to product design and capacity determination? Your initial post should be 200-250 words.

Part II

Read Problem 6: The "Monique Food Processing Company" in Chapter 8 of your text.

Monique Food Processing Company produces light snacks that can be heated in a microwave. The following steps are included in the process:

Steps     Description                                         Capacity (Units/Hour)
1            Prepare food                                             200
2            Measure and place in plastic pouch           175
3            Prepare cardboard box                              200
4            Insert pouch into box                                300
5            Shrink-wrap box                                        200

a) What is the system capacity, and which is the bottleneck department?
b) How much slack (unused capacity) is available in other departments?
c) How much system capacity can be gained by adding capacity to the bottleneck?
d) What are the key factors that determine when to add capacity?
e) Why would an organization want to reduce its capacity?

Format your assignment according to the give formatting requirements:

1. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the course title, the student's name, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Operation Management: What is system capacity and which is bottleneck department
Reference No:- TGS03077525

Now Priced at $55 (50% Discount)

Recommended (93%)

Rated (4.5/5)