What are the upper and lower control limit for an alpha risk


Problem

Given the following process control data for a quality attribute (three samples of size 400 each):

Sample    Defectives
#1                  36
#2                  32
#3                  52

If the process is known to produce 11 percent defectives on average, what are the upper and lower control limits for an alpha risk of .10? .05? .01?