What are the overhead costs per one unit of monitors if the


Question - Dillon Corporation manufactures computer monitors. The company uses a job order costing system, using a plant-wide rate for allocating overhead costs. The current cost method allocates overhead on the basis of direct manufacturing labor hours, using a rate of $100 per labor hour. The plant manager is considering switching over to an activity-based costing system and identifies the following production activities and their cost drivers (these activities are performed for a batch of 99 monitors).

Activities

Cost driver

Allocation Rate

Material handling

Number of parts

$2 per part

Assembly

Labor hours

$20 per hour

Inspection

Minutes at inspection station

$3 per minute

What are the overhead costs per one unit of monitors if the activity-based costing system is used and a batch of 99 monitors are produced? The batch requires 400 parts, 8 direct manufacturing labor hours, and 10 minutes of inspection time.

$8 per monitor

$13 per monitor

$10 per monitor

$12 per monitor

Solution Preview :

Prepared by a verified Expert
Accounting Basics: What are the overhead costs per one unit of monitors if the
Reference No:- TGS02919222

Now Priced at $25 (50% Discount)

Recommended (90%)

Rated (4.3/5)