Vehicles begin to arrive at a toll booth


Vehicles begin to arrive at a toll booth at 850 am with an arrival rate of x(t) = 4.1 + .01t (with t in min and x(t) in veh /min.) The toll booth opens at 9am and processes vehicles at a rate of 12 per minute throughout the day. Assuming D/D/1 queuing, what will be the total vehicle delay?