Use the graphical solution procedure to determine the


Applied Technology, Inc. (ATI), produces bicycle frames using two fiberglass materials that improve the strength-to-weight ratio of the frames. The cost of the standard grade material is $7.50 per yard and the cost of the professional grade material is $9.00 per yard.

The standard and professional grade materials contain different amounts of fiberglass,

Carbon fiber, and Kevlar as shown in the following table:

Standard Grade                                                  Professional Grade

Fiberglass                                                          84%                                                                            58%

Carbon fiber                                                     10%                                                                            30%

Kevlar                                                                6%                                                                              12%

ATI signed a contract with a bicycle manufacturer to produce a new frame with a carbon fiber content of at least 20% and a Kevlar content of not greater than 10%. To meet the required weight specification, a total of 30 yards of material must be used for each frame.

a. Formulate a linear program to determine the number of yards of each grade of fiberglass material that ATI should use in each frame in order to minimize total cost. Define the decision variables and indicate the purpose of each constraint.

b. Use the graphical solution procedure to determine the feasible region. What are the coordinates of the extreme points?

c. Compute the total cost at each extreme point. What is the optimal solution?

d. The distributor of the fiberglass material is currently overstocked with the professional grade material. To reduce inventory, the distributor offered ATI the opportunity to purchase the professional grade for $8 per yard. Will the optimal solution change?

e. Suppose that the distributor further lowers the price of the professional grade material to $7.40 per yard. Will the optimal solution change? What effect would an even lower price for the professional grade material have on the optimal solution? Explain.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Use the graphical solution procedure to determine the
Reference No:- TGS02586812

Expected delivery within 24 Hours