Two estimating methods we have studied are parametric


Two estimating methods we have studied are parametric estimating and 3-point estimates. Explain how these could be used to mitigate risks in two of the RBS heading areas: “project management” and“technical” risks.(4 points = 2 points per clear two paragraph description of an estimating method that can be used to mitigate risks)

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Two estimating methods we have studied are parametric
Reference No:- TGS01199571

Expected delivery within 24 Hours