Total manufacturing costs assigned to job


Weaver Company's predetermined overhead rate is $18.00 per direct labor-hourand its direct labor wage rate is $12.00 per hour. Tjhe following information pertains to Job A-200.

Direct materials $200
Direct labor $120

1. What is the total manufacturing costs assigned to Job A-200?

2. If Job A-200 consists of 50 units, what is the average cost assigned to each unit included in the job?