Toorak ltd produces components for wind turbines the


Required: Using Excel, answer the questions below. Use one tab per question and also include any written response within Excel. Note that marks are also allocated for professional presentation and the use of formulas within Excel.

QUESTION 1

Toorak Ltd produces components for wind turbines. The following data reflect activity for the year 2016:

Costs incurred:

Purchases of direct materials (net) on credit          $124 000

Direct manufacturing labour cost                                60 000

Indirect labour                                                             54 500

Depreciation, factory equipment                                  30 000

Depreciation, office equipment                                      7 000

Maintenance labour, factory equipment                       20 000

Miscellaneous factory overhead                                     9 500

Rent, factory building                                                    70 000

Advertising expense                                                      90 000

Sales commissions                                                        30 000

 

Inventories:

1 January 2016                31 December 2016

Direct materials                                                       $ 9 000                                $ 11 000

Work in process                                                         6 000                                   21 000

Finished goods                                                        69 000                                   24 000  

Toorak Ltd allocates overhead to work in process at a rate of $3.50 per direct manufacturing labour dollar.

REQUIRED: Create journal entries for these transactions, including dealing with over or under allocated overhead.

QUESTION 2

Timber Garden Sheds Pty Ltd incurred the following costs for job number SH400, which consisted of 500 flat pack sheds for sale to a hardware store.

Direct material:

 1 December Requisition no. 520:   900 metres of timber @ 8.50 per metre

 16 December Requisition no. 101:  600 metres of metal panels @ $4.40 per metre

Direct labour:

16 December Timesheet no. 72:   500 hours@$24 per hour

Manufacturing overhead:

 Applied on the basis of direct labour hours @$12 per hour

Additional information:

 Job SH400 was completed on 16 December.

REQUIRED: Prepare a job cost sheet including dates & requisition / timesheet numbers and record the information given above and also a cost summary for job SH400.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Toorak ltd produces components for wind turbines the
Reference No:- TGS02567555

Now Priced at $10 (50% Discount)

Recommended (93%)

Rated (4.5/5)