This problem demonstrates that although equation for rate


This problem demonstrates that although Equation (10.2) for a rate monotonic scheduling is a sufficient condition for successful scheduling, it is not a necessary condition (i..e sometime successful scheduling is possible even if Equation (10.2) is not satisfied).