The weinberger electronics corporation manufacture the


The Weinberger Electronics Corporation manufacture... The Weinberger Electronics Corporation manufactures four highly technical products that it supplies to aerospace firms that hold NASA contracts. Each of the products must pass through the following departments before they are shipped: wiring, drilling, assembly and inspection. The time requirement in hours for each unit produced and its corresponding profit value are summarized in the following table: Department Product Wiring Drilling Assembly Inspection Unit profit XJ201 0.5 0.3 0.2 0.5 9 XM897 1.5 1 4 1 12 TR29 1.5 2 1 0.5 15 BR788 1 3 2 0.5 11 The production available in each department each month, and the minimum monthly production requirement to fulfill contracts, are as follows: Department Capacity (hours) Product Minimum Prod. Level Wiring 15,000 XJ201 150 Drilling 17,000 XM897 100 Assembly 26,000 TR29 300 Inspection 12,000 BR788 400 The production manager has the responsibility of specifying production levels for each product for the coming month. Help him by calculating( that is, setting up the cnstraints and objective funtion) Weinberger's problem using LP. PLease show work in Excell QM

Request for Solution File

Ask an Expert for Answer!!
Operation Management: The weinberger electronics corporation manufacture the
Reference No:- TGS01674965

Expected delivery within 24 Hours