The unassembled bikes are sold to retailers at 400 each


Donkey Bikes could sell its bicycles to retailers either assembled or unassembled. The cost of an unassembled bike is as follows.

DirectMaterials      $150
Directlabor            70
Variable Overhead(70% of directlabor)   49
Fixedoverhead (30% of directlabor)       21
Manufacturingcost perunit                   290

The unassembled bikes are sold to retailers at $400 each.

Donkey currently has unused productive capacity that isexpected to continue indefinitely; management has concluded thatsome of this capacity can be used to nassemble the bikes and sellthem at $450 each. Assembly the bikes will increase directmaterials by $5 per bike, and direct labor by $20 per bike. Additional variable overhead will be incurred at the normalrates,but there will be no additional fixed overhead as a result ofassembling the bikes.

Instructions

a. Prepare an incremental analysis for n the sell-or-process further decision
b. Should donkey sell or process further? why or why not

Request for Solution File

Ask an Expert for Answer!!
Accounting Basics: The unassembled bikes are sold to retailers at 400 each
Reference No:- TGS0596137

Expected delivery within 24 Hours