The precedence view shows the tasks as they are scheduled


Assignment:

Instructions: Figure below is shown in precedence view. Load level (using a load level view) this project so that no given resource is being used on multiple tasks simultaneously, i.e., each resource is working on only one task at a time. Rule: the predecessor-successor relationships must stay the same. That is, the logic of the sequence of tasks must stay the same.

1854_Different configurations of a set of project tasks.png

The example shows two different configurations of a set of project tasks.

The precedence view shows the tasks as they are scheduled using predecessor and successor relationships. These relationships are not leveled with regard to the utilization of resources, they are simply shown in sequential order. Tasks not connected together or joined by arrows can be performed in parallel The load leveled view shows the tasks as scheduled, but considers the capacity of the resource. No two tasks performed by the same resource are scheduled at the same time. Thus, the assigned tasks each resource works on is leveled over time.

Request for Solution File

Ask an Expert for Answer!!
Finance Basics: The precedence view shows the tasks as they are scheduled
Reference No:- TGS01245716

Expected delivery within 24 Hours