The order lot determined by fixed lot-size ordering mrp


1. The order lot determined by fixed lot-size ordering MRP system is equal to the net requirements lot.   True or False

2. As a production planning strategy, Chase strategy is matching the production rate to the order rate by change workforce size.   True or False

3. Which of the following is NOT a characteristic of JIT production?

Right time

Large lot size

Right amount

Low or virtually no inventory

4. When product demand is unknown, backward scheduling is desirable. True or False