The master production schedule is related to MRP and the production plan in that:

I: The MPS drives the production plan

II: The MPS disaggregrates the production plan

III: The MPS is the starting point for MRP

Which combination of statement(s) is true?

a). II only

b). II and III only

c). I and II only

d). I, II, and III

Part2

Typical uses of master schedule activity include which of the following?

I: Driving a material requirements planning system

II: Planning future production

III: Employing rough-cut capacity planning

IV: Establishing the production plan

Which combination of use(s) are correct?

a). I only

b). II and III only

c). I, II, and III only