The industrial engineer in the machine tech inc company


The industrial engineer in the Machine Tech, Inc. Company would like to assign a number of similar facilities to an operator, based on the goal of minimizing the cost per unit of output.

A detailed study of the facilities has shown the following performance requirements:

Loading machine standard time = 0.34 min

Unloading machine standard time = 0.26 min

Walk time between two machines = 0.06 min

Operator rate = $12.00/hour

Machine rate (both idle and working) = $18.00/hour

Power feed time = 1.48 min

How many of these machines should be assigned to each operator?