The idea that statistical methods of quality control


1) A bottleneck in a manufacturing process may be targeted and eliminated by employing which of the following?

Increase the capacity of a nonbottleneck resource.
Install more efficient equipment where capacity is less than the demand.
Increase labor equally throughout the system.
Increase the idle time of a capacity-constrained resource in the system.

2) The Shingo approach to quality control depends on which of the following?

Extensive use of control charts
Use of source inspection on 100% of the items produced
Use of statistically based approaches to quality control
Use of a sophisticated method of acceptance sampling

3) According to the theory of constraints which of the following can be a CCR?

· An employee
Product design
Factory layout
· A customer

4) According to the theory of constraints, which of the following is an OPERATIONAL measurement that can be used to measure the firm's ability to make money?

Inventory
Unit cost
Operating revenue
· Net Profit

5) Which of the following is a focusing step of Dr. Eli Goldratt's theory of constraints?
Isolate constraints to reduce the constraint's capacity.
Do not modify a process after improvement of a constraint is achieved.
Identify system constraints that prevent the system from achieving its goal.
· Align the whole system to support processes prior to the constraint.

6) Identifying critical-to-quality characteristics (CTQs) takes place in which step of the DMAIC methodology?
Analyze
Define
Measure
Improve

7) According to the theory of constraints, which of the following would be included in the Throughput operational measurement?
Goods sold
Raw materials
Work in process
Finished goods

8) The Shingo system of quality control relies heavily on fail-safe procedures or devices called what?
CTQs
Poka-yokes
DPMO's
· Checklists

9) Goldratt's theory of constraints (TOC) could be restated using which of the following?
· Continuous adjustments after a constraint problem is solved will cause more problems
A system constraint cannot be identified and thus cannot be improved
· Any system is limited in achieving more of its goals by a very small number of constraints
· A system with constraints will not be able to achieve its goals

10) Which of the following are examples of Goldratt's Rules of Production Scheduling?
· Nonbottlenecks govern throughput
Utilization and activation are the same
An hour saved at a bottleneck is a mirage
· Balance flow, not capacity

11) The DMAIC cycle of Six Sigma is similar to which of the following quality management topics?
Continuous improvement
ISO 9000
SERQUAL
· External benchmarking

12) Statistical Process Control (SPC) and data from the actual process to statistically monitor the process over time are employed during which step of the DMAIC cycle?
Improve
Define
Control
Measure

13) The idea that statistical methods of quality control, including six-sigma, does not prevent defects, is central to what alternative quality system?

Shingo System
SQC methods
Deming PDCA cycle
DMAIC cycle

14) According to Goldratt, which of the following is defined as "any resource whose capacity is less than the demand placed on it"?
Capacity-constrained resource

Buffer resource
Bottleneck resource
Nonbottleneck resource

15) According to the theory of constraints which of the following is a FINANCIAL measurement that can be used to measure the firm's ability to make money?

Inventory
Sales
Operating expenses
Cash flow