The effective water head for a 100 mw station is 220 metres


The effective water head for a 100 MW station is 220 metres. The station supplies full loadfor 12 hours a day. If the overall efficiency of the station is 86.4%,find the volume of water used.

Request for Solution File

Ask an Expert for Answer!!
Electrical Engineering: The effective water head for a 100 mw station is 220 metres
Reference No:- TGS0617401

Expected delivery within 24 Hours