The demand for the super titan tires is 1000000year the


Question: The demand for the Super Titan tires is 1,000,000/year. The setup cost for each production run is $4000, and the manufacturing cost is $20/tire. The cost of storing each tire over the year is $2. Assuming uniformity of demand throughout the year and instantaneous production, determine how many tires should be manufactured per production run in order to keep the production cost to a minimum.