The crane hoists a uniformly distributed load c the two


The crane hoists a uniformly distributed load C. the two identical motors at A an power through gearboxes operating at maximum output speed of 100 rpm.the load is lifted by winding cable onto spindles attached to the output shaft of each gear box. The spindles both have the same diameter, d. What would the spindle diameter need to be in order to move with a velocity of 1 m/s?

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: The crane hoists a uniformly distributed load c the two
Reference No:- TGS0654672

Expected delivery within 24 Hours