The city of edmonton has solicited the services of a


Question: The City of Edmonton has solicited the services of a mechanical engineering consulting firm to design a heating system for a public pool located in the City. The pool will be 20 ft wide and 15 ft long. It will be 4 ft deep at one end, varying linearly along the length of the pool to a depth of 10 ft. The pool water is to be heated to 77?F in the month of May. The focus of the design will be to provide a system that can heat the water from an initial temperature, after winter closure.

The 2006 Alberta Building Code, Division B, Section 7.3.3.9 requires that the slope of the bottom of public swimming pools be no more than 1:3. Section 7.3.3.39 of the same code also requires that the turnover period (recirculation period) of the pool water shall not exceed 4 hours. Design a heating system that is complete with one or more boiler packages. The maximum length of the piping system may be 25-50 ft from the pool. Reference to the 2006 Alberta Building Code may be useful.

Request for Solution File

Ask an Expert for Answer!!
Mechanical Engineering: The city of edmonton has solicited the services of a
Reference No:- TGS02294181

Expected delivery within 24 Hours