The assignment is to create a comprehensive cost estimate


The assignment is to create a comprehensive cost estimate based on the generic plans for the warehouse. Include all work associated with Construction Specifications Institute (CSI) MasterFormat 2004 Specifications Divisions 1 through 6 and 31 through 34. These Divisions are items typically associated with Civil Engineers. A spreadsheet is attached for your use in preparing the estimate.

Attachment:- Assignment.rar

Solution Preview :

Prepared by a verified Expert
Civil Engineering: The assignment is to create a comprehensive cost estimate
Reference No:- TGS01142571

Now Priced at $45 (50% Discount)

Recommended (99%)

Rated (4.3/5)