The amount of time available on machine a is 360 hrs and on


A company makes two products (1 and 2). Each product requires time on two machines A and B. The specifications for each product are as follows;

                                                                     Product 1        Product 2

Processing time on machine A (hrs/unit)                 2                   2

Processing time on machine B (hrs/unit)                 1                   2

Material and labor cost (Kshs/unit)                        14                 15

Selling price (Ksh/unit)                                         16                 18

Maximum possible sale (units)                              130               150

The amount of time available on machine A is 360 hrs and on machine B is 260 hrs. Formulate the LP problem, which when solved, would indicate the number of product 1 and 2, which should be sold in order to maximize total contribution for the company.

Solution Preview :

Prepared by a verified Expert
Mathematics: The amount of time available on machine a is 360 hrs and on
Reference No:- TGS01467016

Now Priced at $20 (50% Discount)

Recommended (94%)

Rated (4.6/5)