The adair wind farm was commissioned in 2008 by midamerican


The Adair wind farm was commissioned in 2008 by MidAmerican Energy. The wind farm, located in Iowa on the border of Adair County and Cass County, is composed of 76 Siemens wind turbines each with a rated capacity of 2.3 MW. Each wind turbine has a rotor diameter of 93 meters, a power coefficient (coefficient of performance) equal to 75% of Betz’ law, and a combined gearbox and generator efficiency of 96%. It is estimated that the wind farm generates 437 GWh of electricity each year. Each wind turbines requires 400 hours of maintenance each year. The density of air is 1.225 kg/m3.

a. What is the overall efficiency of the wind turbines (%)?

b. What is the capacity factor of the wind farm (%)?

c. What is the rated wind speed for the wind turbines (m/s)?

d. What is the availability of the wind turbines (%)?

Request for Solution File

Ask an Expert for Answer!!
Mechanical Engineering: The adair wind farm was commissioned in 2008 by midamerican
Reference No:- TGS0970555

Expected delivery within 24 Hours