Task- details of asta programme progress reporting and risk


Task- Details of ASTA Programme, Progress Reporting and Risk Simulation

Report Presentation

Cover page, table of contents, Introduction, conclusions and list of references

Page set up of programmes, visual appearance with suitable border and necessary project information

a) ASTAprogramme

Adequate number of appropriate activities (40-50) including those highlighted in further guidance document

List of relevant assumptions made for developing the ASTA programme of the project

Construction starts at week 1 and logical link between predecessors & successors, suitable milestones and required summary bars

Provide evidence of duration calculations (couple of the major work activities) with supporting evidence and references

Consideration of external works such as roads, sewers, demolitions, site clearance & services diversion in programme

b) Progress report

Date correctly shown for client order and the progress tracking at end of week 15 in the programme

Must show Progress line , preconstruction activities and reasonable overall construction period

Appropriate number of activities and the consideration of events in progress highlighted in the guidance document

Discussion the impact of delays on other activities and on the projected completion date of the project.

c) Risk simulation

List of Inputs information, which you will assign for the risk simulation using ASTA risk simulation.

Allocation of different level of risks on work activities using code library method

Discussion about sampling methods and risk distribution types assumed for risk simulation in construction programme

Sensitivity, and Probability & distribution graphs with key information of project risks shown in the graphs index

Discussion on the sensitivity report on work activities and project duration of critical tasks

Discussion on the probability and distribution report on overall project duration

Method of statement

Method of statement should to support your programme and must include how you propose to carry out the project and an explanation of why you have chosen the methodology with necessary references.

Use ASTA Software No PLAGARISM Attached all files

Solution Preview :

Prepared by a verified Expert
Other Engineering: Task- details of asta programme progress reporting and risk
Reference No:- TGS01287671

Now Priced at $110 (50% Discount)

Recommended (99%)

Rated (4.3/5)