Suppose the speedy beet requires 1500 machine hours 92


Question - Lakeside Inc. manufactures four lines of remote control boats and uses activity-based coating to calculate product cost.

Activity Cost Pools

Estimated Total Cost

Estimated Cost Driver

Machining

$317,000

13,800 machine hours

Setup

58,000

280 batches

Quality Control

98,000

710 inspections

Suppose the Speedy beet requires 1,500 machine hours, 92 batches, and 320 inspections.

Using the activity rates, determine the amount of overhead assigned to the Speedy product line.