Summary of processing sequences required for the products


Assignment:

Five departments A, B, C, D, and E(each 1500ft) are involved in the process required for ing three products (1, 2, 3) and are served by an automated guided vehicle. A summary of the processing sequences required for the products and weekly production volumes are shown in the table below.

Product

Processing Sequences

Weekly Production

Volume (compared to product 1)

1

BDCAE

60

1

2

BCDEA

50

2

3

EBDCA

220

0.5

(a) Now construct a material flow matrix (From To Chart) based on given material routing information, and then convert it to a REL chart.

(b) Develop final adjacency-based graph (a REL graph) according to the equivalent material flow between the departments.

(c) Develop a dual graph (Spoints) and also a final block layout based on your REL graph.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Summary of processing sequences required for the products
Reference No:- TGS03031596

Expected delivery within 24 Hours