Summarize the project requirements and other assumptions eg


1. Write a one to two (1-2) page summary document in which you:

a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

b. Define a work breakdown structure and describe the methodology behind constructing one.

2. Use Microsoft Project to create a WBS which:

a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.

b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c. Contains Work Breakdown Structure Code for each task.

d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.