Stromski corporation manufactures


Stromski Corporation manufactures a single product. The standard cost per unit of product is shown below.Direct materials-1 pound plastic at $7.00 per pound $ 7.00Direct labor-1.5 hours at $12.00 per hour 18.00 Variable manufacturing overhead 11.25 Fixed manufacturing overhead 3.75 Total standard cost per unit $40.00

The predetermined manufacturing overhead rate is $10 per direct labor hour ($15.00 ÷ 1.5). It was computed from a master manufacturing overhead budget based on normal production of 7,500 direct labor hours (5,000 units) for the month. The master budget showed total variable costs of $56,250  and total fixed overhead costs of $18,750 ($2.50 per hour). Actual costs for October in producing 4,900 units were as follows.

  • Direct materials  $ 37,230
  • Direct labor  87,500
  • Variable overhead 56,170
  • Fixed overhead 19,680

Total manufacturing costs $200,580 The purchasing department buys the quantities of raw materials that are expected to be used in production each month. Raw materials inventories, therefore, can be ignored.

Request for Solution File

Ask an Expert for Answer!!
Accounting Basics: Stromski corporation manufactures
Reference No:- TGS0679378

Expected delivery within 24 Hours