State college parts produces two types of saw table


State College Parts produces two types of saw table stabilizers for at home customers. The production process requires milling and turning. Each type 1 part requires 6 minutes of milling and 4 minutes of turning. Each type 2 part requires 4 minutes of milling and 8 minutes of turning. There are 36 hours of milling time and 40 hours of turning time available. Type 1 parts generate $30 of profit and type 2 parts generate $40 of profit. Demand for type 2 parts is limited so at most 800 will be produced.

a. Formulate an LP model for this problem that maximizes the total profit.

b. Solve using Excel solver.