Sources of mrp gross requirements can include safety stock


1. Sources of MRP gross requirements can include:

a) multiple products.

b) items sold directly.

c) spare parts.

d) All of the above

e) None of the above

2. Safety stock is used to protect against variability in:

a) bills of material.

b) inventory records.

c) demand.

d) lead times.

e) All of the above

f) None of the above

3. Time units in a material requirements planning system are called:       

a) increments.

b) cans.

c) modules.

d) troughs.

e) buckets.