Show how to minimize the maximum month-to-month change in


1. Suppose that all irrigation releases are either equal to or short of the target. Show how to minimize the maximum month-to-month change in the fractional delivery of the irrigation target. Use standard form and indicate nonnegativity appropriately.

2. Describe another method of iterative approximation for the hydropower problem of Section 11.E1. That is, do not guess X, in the hydropower constraints.