selection criteria for the type of scheduling


Selection Criteria for the Type of Scheduling

There are several types of scheduling system selection of a particular system depends on a number of factor. Some of these are described as follow:

a)Available infrastructure such as machine capacity and number.
b) Type of layout such as process and product types.
c) Volumes of production such as low volume or high volume .
d) Type of products standardized and non standardized.
e) Type of production systems such as job shop and mass production.
f)Priority of job.
g) Time schedules such as operation waiting and delivery time.
h) Cost aspects such as set up cost change over cost etc.

Every system of scheduling has it merit and emeriti. Therefore there is nothing like an ideal system or a best system of scheduling. What is relevant is to select the most suitable system of scheduling which suits a particular production background and working environment. This ability to select the most suitable system depends on the professional and conceptual skill of managers. Since the time and working conditions changes we may as well change even the existing scheduling system accordingly.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: selection criteria for the type of scheduling
Reference No:- TGS0202856

Expected delivery within 24 Hours