Schedule of works for the refurbishment of university campus

A schedule explains the method and procedure by which the works will be carried out using NBS - National Building Specification

A FILE WILL BE UPLOAD TO SHOW THE EXISTING FLOOR PLAN AND THE NEW FLOOR PLAN ( TO SHOW THE WORKS THAT WILL NEED TO BE CARIRIED OUT)

Works that need to done.

1. relocating the mens toilets from one location to another, (reusing the same materials)

2. installing a new ventilation system

3. the removal of the second entrance door and the installing of the glass automatic door at the entrance,

4. the installation of the reception desk with shutters.

5. remove of the small room with the office space.

6. Repainting all the walls (colour to be approved by client)

7. Replacing to 2 internal doors

What needs to be included?

Materials
• Type
• Colour
• Size
• Specific supplier or brand

Method
• Finish required
• Access (scaffolding or ladder?)
• Safety requirements

For each element you need to think about
• How will it be carried out
• What materials are used
• The location of the material or process
• Quantities
• Quality
• Standards
• Building regulations

Example of format.
1. Set up site facilities and erect appropriate scaffolding to BS EN 12811-1:2003
2. Remove existing slates/ridge tiles and salvage useable whole slates/ridge tiles for reuse. Safely stack on scaffold
ensuring adequate brick guards are in place. F

3. it new plywood sub facia using 18mm WBP hardwood ply using 60mm passivated screws

4. Fit new uPVC 200mm x 20mm facia (colour to be approved by client) with 50mm polytop stainless steel annular ring nails (colour to match facia)

5. Fit new uPVC 10mm ventilated soffit with 40mm polytop stainless steel annular ring nails (colour to match facia)

6. Fit new black plastic from Polypipe® Elegence® range - to include all rainwater fixtures and fittings (gutters, downpipes, brackets etc)

7. Fit new black plastic eaves support trays to provide underfelt support . Ensure minimum 50mm lap into gutter

No# of Pages:4 pages (1,000 words)

Paper Style:Harvard

No# of Sources Required:4

Attachment:- joineddocument.pdf