Research and build a data file including 24 h of electrical


Taking into account some wind speed data from Problem 1, a second data sheet should be constructed using the generator cost data from USDOE EIA. This data table should have the minimum information needed to calculate the annualized fixed cost values.

Write a report with a spreadsheet in order to discuss the capital costs and required capacity factor.

Include the operating and maintenance (O&M) and find the annual fixed cost amount for such economics based model. You should ignore the electrical power transmission investment costs for this study because they are usually built with governmental support and contracts.

Problem 1:-
Research and build a data file including 24 h of electrical demand data for 30 residences, 15 shops, and 5 factories, along with some wind speed data. These data might be reasonably fabricated for your studies, but it should be representative of a small downtown district; that is, each hour is associated to the respective load in kWh.

Request for Solution File

Ask an Expert for Answer!!
Financial Management: Research and build a data file including 24 h of electrical
Reference No:- TGS01717764

Expected delivery within 24 Hours