q 1 low level coding in mrp indicates the exact


Q 1 Low level coding in MRP indicates the exact status of each item managed by the system in "real time."

Q 2 Which of the following is considered a secondary report in an MRP system? A. Planned order schedule B. Exceptions reports C. Inventory record D. Firm orders from known customers E. Engineering change reports.

Q 3 Which of the following is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal? A. Economic Order Quantity B. Lot for lot C. Least total cost D. Least unit cost E. ABC analysis.

Q 4 Which of the following is considered a primary report in an MRP system? A. Planned order schedule B. Peg report C. Planning report D. Inventory accuracy report E. Aggregate production plan report .

Q 5 In an MRP program, the program accesses the status segment of an inventory record according to specific periods called which of the following? A. Cubed time units B. Time buckets C. BOM units D. Time modules E. Time lines

Request for Solution File

Ask an Expert for Answer!!
Operation Management: q 1 low level coding in mrp indicates the exact
Reference No:- TGS0391114

Expected delivery within 24 Hours