Put together the best possible combination of ladder logic


Final Exam

Phase 1 Change Notice

CONGRATULATIONS! Your initial program design was accepted by Ford FRAP, and you now have the responsibility for designing the complete program that will become your Final Exam Project for the FRAP facility. Since you and your partner already have come up with an initial program (from your Midterm Exam), you are to complete the following steps for this Phase 1 Change Notice:

1. Put together the best possible combination of Ladder Logic from your separate programs into 1 complete program for the Siemens PLC. Configure your program for the correct PLC, the correct Signal Board, and the correct HMI - all this information can be found on the equipment up in the PLC lab. When you complete your initial configuration, call it Final Exam 2016 and make sure each of you has the most updated version of this program.

2. There are only 14 hard-wired Inputs and 10 hard-wired Outputs available on the Siemens PLC. Allocate the following Inputs to the following Tag Names:

- I0.0 - E-Stop
- I0.1 - Start
- I0.2 - DWP Manual
- I0.3 - DWP 1Auto
- I0.4 - DWP 2Auto
- I0.5 - DWP 3Auto
- I0.6 - FWAP/NT Solenoid ON
- I0.7 - FWAP/ST Solenoid ON
- I1.0 - Spare
- I1.1 - Reset
- I1.2 - DWP 2 Select
- I1.3 - DWP 3 Select
- I1.4 - FWAP/NT Select
- I1.5 - FWAP/ST Select

Allocate the following Outputs to the following Tag Names:

- Q0.0 - E-stopQ
- Q0.1 - StartQ
- Q0.2 - FRWS/OKQ
- Q0.3 - DWP 1Q
- Q0.4 - DWP 2Q
- Q0.5 - DWP 3Q
- Q0.6 - FWAP/NT Solenoid ONQ
- Q0.7 - FWAP/ST Solenoid ONQ
- Q1.0 - SpareQ
- Q1.1 - SpareQ

Final Exam

Phase 1 Change Notice

You should probably allocate the above I/O's first, and remember that this is just an Initial Configuration. There may be changes required as you progress through this project, so just relax and do your best with each step as you go. Your goal at this point is to properly configure your program so that it functions like a self-contained program. Also, you should familiarize yourself with the Internal M-bits in the Siemens TIA, as you will be using these also for your completed program. Remember, this is work that you are to be doing on your own. Plan your work and time accordingly. And make sure you back-up your program frequently to an external device such as a flash drive or your own personal UTAD account.

Attachment:- Initial Program Design.pdf