Project 1 inspection quality problem using dmiac subject


Co-op training report - industrial engineering

Help me with the coop training report. I trained in logistic company and I need to summarize my train in one report.

My company is LSS warehouse logistic company. Company website: https://www.lss.com.sa

- That what I have for this report , you can add more projects if you have more ideas.

- About Measurement, you can assume numbers from the internet.

- You can take ideas from the old reports that I uploaded to you

Project 1: Inspection quality problem using DMIAC

Subject: delay inputing out the material if their is a quality failure.

Problem: After a quality inspection failure, the company sending email to the client waiting to get replay to take the responsibility to the handle shipment.

Solution: All employs /Material Handel should be trained / given proper training to handle any quality failure or taking the responsibility to react in such situation. Later will inform to the client regarding the quality failure.

This problem I want to love it by DMAIC

Define the problem:

Measurement:

Shipment arrival time

Quality inspection time

Quality inspection statues

inform to client

Putout time

9:30 AM

9:35 AM

FAIL

9:45 AM

4:00 PM

10:30 AM

10:35 AM

PASS

NA

10:55 AM

 

 

 

 

 

etc.. for 10

 

 

 

 

Analyzing: You can check ISE 323 Project in analyzing part.

Improve: Is the solution of the problem.

Project 2 - Packaging design

Problem: The Company using a machine that takes a long time for packing also it can be damaged also it can be fall during transport by forklift.

They use this machine:

https://www.rocketindustrial.com/stretch/wrappers/manual/fox-manual-stretch-wrapper.html

Here we have to design for two things:

1- Packaging machine

They use this machine: https://www.rocketindustrial.com/stretch/wrappers/manual/fox-manual-stretch-wrapper.html

Designing should be similar way that we have in the old reports.

2-forklift design

They use this forklift which is old one (cannot go backward, limit load, and more disadvantages that you related to our problem (pack can be fall during transport)).

Project 3 -

Problem is when you have a longer FiFo lane but not enough space on the shop floor. In this case, you may break the FiFo lane into different parallel segments.

LSS is using Drive in racking system

Their are systems that is better than Drive in racking system:

  • Shuttle system
  • Selective racking system

This project can be solved by facility planning.

Assignment Link - https://www.dropbox.com/s/pewqshz7oylv26w/Assignment.rar?dl=0

Request for Solution File

Ask an Expert for Answer!!
Other Engineering: Project 1 inspection quality problem using dmiac subject
Reference No:- TGS02136815

Expected delivery within 24 Hours