Production-volume variance with other variances


Task: Comparisons of Production-Volume Variance with Other Variances

The only new variance introduced in this chapter is the production-volume variance, which arises because fixed-overhead accounting must serve two masters: the control-budget purpose and the product-costing purpose. Underapplied or overapplied overhead is always the difference between the actual overhead incurred and the overhead applied. An analysis may then be made:

underapplied overhead = ( flexible-budget) + (production-volume)
variance    variance

Overhead Variances

Consider the following data for the Rivera Company:
Factory Overhead
Fixed Variable
Actual incurred $14,200 $13,300
Budget for standard hours allowed
for output achieved 12,500 11,000
Applied 11,600 11,000
Budget for actual hours of input 12,500 11,400

From the above information, fill in the blanks below. Be sure to mark your variances F for favorable and U for unfavorable.

a. Flexible-budget variance $______ Fixed $______Variable $______
b. Production-volume variance $______ Fixed $______Variable $______
c. Spending variance $______ Fixed $______Variable $______
d. Efficiency variance $______ Fixed $______Variable $______

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Production-volume variance with other variances
Reference No:- TGS01927915

Now Priced at $25 (50% Discount)

Recommended (93%)

Rated (4.5/5)