Process Review:

Design the building:

This submittal will include RESEARCH focused on your thesis project and type. Each section should include an ANALYSIS + APPLICATION section. Everything should be in final professional format and updated if any changes have occurred. Include the following at minimum:

  • Cover page & Table of Contents
  • Project Description - including model client, mentor, building location, type, etc.
  • Project Type Design RESEARCH - including RESEARCH sections specific to your type

o Organizational chart - how does your specialization work?

o User Analysis - Description of anticipated users, circulation diagrams and descriptions - ANALYSIS + APPLICATION

  • Pre-Design Investigation

o Existing Building History, Analysis & Application

» Structural systems - description & diagram

» Distribution systems (HVAC, Thermal & Plumbing) - description & diagram

o Integrated Design practices - description

o Contextual Data & Global Context Implications

  • Post Occupancy Evaluations
  • Site Visit
  • Schematics

o Goals, objectives - related RESEARCH

o Design concept or Theme or Metaphor Statement

o Inspirations/Precedence

o Adjacency matrix

o Bubble Diagrams

o Block Diagrams

o Experience - words, experience-element matrix, words on bubble diagram

o Ideation sketches

  • Synthesized Program Statement, Program Summary & Detailed Program
  • Mentor + Model Client Meeting Minutes

o Model client interview with questions and responses

  • Elements & Principles of Design - show examples of how you have incorporated these into your design
  • Principles & Concepts - research the principles listed below, explain and show how you have applied them into your project.

o Universal Design

o ADA

o Anthropometrics & Ergonomics

o Proxemics

o Natural & Artificial Lighting

o Color

o Acoustics

o Indoor Air Quality

o Sustainability

IAD 452: IAD STUDIO VI - THESIS 1

  • Budget - What does RESEARCH say your budget should be, how did you come up with this number?
  • Industry-specific regulations- Description/RESEARCH, Analysis & Application
  • Zoning- Description/RESEARCH, Analysis & Application
  • Laws, Codes, Standards and Guidelines - provide a summary of codes you must apply to your project and several diagrams showing occupancy (classification, occupant loads, plumbing required), egress (exits, placement of exits, exit width, longest travel distance, common path of travel, dead end corridor, requirements with egress, width, spacing, distance...), fire protection (fire separation, rating walls and doors, fire alarms, fire extinguishers)
  • Building Diagrams/Graphics - Provide floor plans of at least 3 additional things you can represent graphically that will enforce your design, concept, elements, principles, goals, etc. focusing on RESEARCH, ANALYSIS & APPLICATION
  • Works Cited Page

CONSTRUCTION DOCUMENTS - printed out to scale

Half of your construction documents must be turned in at this point. Those listed below in bold, must be turned in, you can pick from the categories listed below. The more you turn in the more feedback you will receive. Review these with your mentor prior to turning them in.

  • Cover Sheet

Pick 1 of the following to turn in

  • Demolition Plan
  • Life Safety Plan

Pick 1 of the following to turn in

  • Partition Floor Plan & Details
  • Door Schedule & Details
  • Reflected Ceiling Plan(s)

Pick 1 of the following to turn in

  • Furniture Floor Plan(s) & Schedule
  • Finish Floor Plan(s) & Schedule

Pick 1 of the following to turn in

  • Power & Communication Plan
  • Restrooms & Fixture Schedule
  • Detail drawings

Attachment:- Programming-Scematics and Research.rar

Request for Solution File

Ask an Expert for Answer!!
Other Engineering: Problems based on programming, schematics and research
Reference No:- TGS03051915

Expected delivery within 24 Hours