Problem a 50kw load operates from a 60 hz 10 kv line with a


Problem: A 50kW load operates from a 60 Hz 10 kV line with a power factor of 60% lagging. Determine the capacitance that must be placed in parallel with the load to achieve a 90% lagging power factor.