Prepare a report for buckeyes management with a production


Buckeye Manufacturing produces heads for engines used in the manufacture of trucks. The production line is highly complex, and it measures 900 feet in length. Two types of engine heads are produced on this line: the P-Head and the H-Head. The P-Head is used in heavy-duty trucks and the H-Head is used in smaller trucks. Because only one type of head can be produced at a time, the line is either set up to manufacture the P-Head or the H-Head, but not both. Changeovers are made over a weekend; costs are $500 in going from a setup for the P-Head to a setup for the H-Head, and vice versa. When set up for the P-Head, the maximum production rate is 100 units per week and when set up for the H-Head, the maximum production rate is 80 units per week.

Week

Product Demand

P-Head

H-Head

1

55

38

2

55

38

3

44

30

4

0

0

5

45

48

6

45

48

7

36

58

8

35

57

9

35

58

Managerial Report

Prepare a report for Buckeye's management with a production and changeover schedule for the next eight weeks. Be sure to note how much of the total cost is due to production, how much is due to inventory, and how much is due to changeover.

Solution Preview :

Prepared by a verified Expert
Microeconomics: Prepare a report for buckeyes management with a production
Reference No:- TGS01184775

Now Priced at $30 (50% Discount)

Recommended (93%)

Rated (4.5/5)