Prepare a job order cost sheet showing the estimate given


Hallmark Furniture Company refinishes and reupholsters furniture. Hallmark Furniture uses a job order cost system. When a prospective customer asks for a price quote on a job, the estimated cost data are inserted on an unnumbered job cost sheet. If the offer is accepted, a number is assigned to the job, and the costs incurred are recorded in the usual manner on the job cost sheet. After the job is completed, reasons for the variances between the estimated and actual costs are noted on the sheet. The data are then available to management in evaluating the efficiency of operations and in preparing quotes on future jobs. 

On Febuary 14, 20Y1, an estimate of $897.60 for reupholstering a chair and couch was given to Millard Schmidt. The estimate was based on the following data:

                    Estimated direct materials                                                     $108.00

                        12 meters at $9 per meter

                    Estimated direct labor:

                         32 hours at $16 per hour                                                   512.00

                    Estimated factory overhead (25% of direct labor cost)      128.00

                    Total estimated costs                                                             $748.00

                    Markup (20% of production costs)                                      149.60

                    Total estimate                                                                        $897.60     

On February 17, the chair and couch were picked up from the residence of Millard Schmidt, 315 White Oak Drive, Columbus, Georgia, with a commitment to return them on March 15. The job was completed on March 9. 

The related materials requisition and time tickets are summarized as follows:

Materials Requisition No.                                                  Description                                                          Amount

122                                                                             9 meters at $9                                                       $81

129                                                                              7 meters at $9                                                         63

Time Ticket No.                                                              Description                                                      Amount

T344                                                                                20 hours at $14                                              $280

T348                                                                               18 hours at $14                                                 252

Instructions

1. Prepare a job order cost sheet showing the estimate given to the customer. Use the format shown on the next page.

2. Assign number 02-019 to the job, record the costs incurred, and complete the job order cost sheet Comment on the reasons for the variances between actual costs and estimated costs. For this purpose, assume that four meters of materials were spoiled, the factory overhead rate has been proved to be satisfactory, and an inexperienced employee performed the work.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Prepare a job order cost sheet showing the estimate given
Reference No:- TGS02599355

Now Priced at $10 (50% Discount)

Recommended (93%)

Rated (4.5/5)