Pm 598 project management capstone assignment


PM 598 Project Management Capstone Assignment- University of Phoenix

Write a paper of no more than 1,400 words, addressing the following items:

• How changes to the project scope, timeline, and budget are managed and reported.

• How project cost and schedule performance is measured and reported.

• How project quality is managed and reported.

• Reasons why your project could be closed.

• Closure processes you use for normal completion, such as having objectives met.

• Ethical considerations you may have to make through the project lifecycle and ways to respond.

Explain the processes that must be in place to effectively manage each aspect of the project and your rationale for selecting techniques you plan to use.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Request for Solution File

Ask an Expert for Answer!!
Project Management: Pm 598 project management capstone assignment
Reference No:- TGS03018072

Expected delivery within 24 Hours